MIZ-REC-2026-002 — Integration Verification Report
Date: July 29, 2026
Ref: MIZ-REC-2026-002 (docs/MIZOKI_RECONCILIATION_PROMPT.md, SUPERSEDED 2026-07-27 by MIZ-REC-2026-003)
Question answered: were the superseded reconciliation prompt's mandates properly integrated into this repo?
Answer: YES — every carried-forward mandate is discharged and re-verified at HEAD (c822210, branch parity with origin/main). All six Phase 4 verification gates were re-run in this session and are green (each figure below is a verified result from this session's runs unless labeled otherwise). No code change was needed; this report is the only artifact added.
1. Phase 0 — the plan-of-record obligation
| Mandate | Status | Evidence |
|---|---|---|
docs/RECONCILIATION_PLAN.md |
Superseded, deliberately absent | The prompt's own banner (added per INTEGRATION_PLAN.md §1.4) discharges Phase 0 via docs/INTEGRATION_PLAN.md |
| Plan of record exists and records carried-forward mandates | ✅ | docs/INTEGRATION_PLAN.md §1.4 names MIZ-REC-2026-002, rules it SUPERSEDED, and enumerates the mandates merged forward: shapes-vs-values split, mirror-with-parity fallback, conformance asserting the reconciliation, push-once-when-green, locked-ingress-is-posture, byte-identical virtuoso_models homes, SSH for workflow pushes, claim-label ceiling, never weaken a gate |
| Checkout-state + disposition tables | ✅ | INTEGRATION_PLAN.md §1 (six Phase 0 inputs dispositioned) and §2 (rulings R1–R5) |
| Defect inventory (REVIEW.md ∪ Convergence Plan ∪ gap matrix) | ✅ | docs/REVIEW.md never existed (pre-review drop bdbf0a88); §3 reconstructs the ledger D1–D15 from directive invariants + Convergence Plan Appendix A + independent audit, extended live with D16–D17 |
2. Ground rule 2 — mizoki_contracts wins every definitional conflict
| Overlap | Ruling applied | Verified in tree |
|---|---|---|
| Envelope / eight decision objects | R1: contracts canonical at contracts/mizoki_contracts/ (installable mizoki-contracts 3.5.0) |
Package imports clean; Domain = six members (counsel, cre, estate, finance, media, risk — R2 amendment landed); ClaimLabel = the five governed values |
mizoki_core |
R3: declared in-process mirror, not deleted (stdlib constraint, pre-authorized by the prompt itself) | Authority banner in mizoki_core/envelope.py; parity test tests/remediation/test_core_contract_parity.py; structural divergences recorded under DATA-001, not silently renamed |
Third envelope (contracts/canonical-event-envelope/) |
R4: subordinated with banner, live consumers kept | Present |
| JourneyEvent / CBE | R5: ingestion-adapter formats, normalize into the envelope | Present; connector_gateway migrated Phase 16 |
miz_oki_3.5_integrated/ bundle |
Historical record, never synced over src/shared/ |
Untouched |
Staging dir mizoki-remediation/ |
Promoted via git mv (commit 908d7702), then deleted |
Absent from tree; canonical paths all exist (contracts/, ten services/service-*, ops/remediation/, security/harden_auth.sh, tools/claims_lint.py, tests/remediation/, docs/REMEDIATION_LAYER.md) |
3. Phase 1 — defect closures (commits cite IDs, code spot-checked)
Commit-level mandate held: e6e8ec3a fix(contracts): … (D1,D6,D8,D9,D11,D14,R2) and 88bc8ccb fix(services): … (D3,D4,D5,D6,D7,D10,D11,D12,D13,D14,D15); live-phase fixes 5e3852e3 (D16), 9362cb72/62af2d98 (D17); 80a4d3b (D18).
Spot-checks against the invariants the prompt warned get reintroduced — all hold at HEAD:
| Defect | Code evidence |
|---|---|
| D1 auth fails closed | contracts/mizoki_contracts/auth.py — K_SERVICE = deployed signal; missing SELF_URL/empty allowlist → 503; audience + issuer always verified |
| D4 Stage 4 real two-key | service-action-runner/main.py — register_adapter() is key #3; missing adapter → 501, never phantom execution; rollback invokes the compensating action; contradictory rollback contracts → 422 |
| D5 dev signing key | DCP + runner raise RuntimeError at startup when deployed with the dev default or empty key; secret confined to the two signers (live-measured July 27, recorded in CLAUDE.md) |
| D6/D7 tenant + approvals | resolve_tenant() enforced; /pending tenant-required and caller-resolved; approval single-use → second grant 409; grant binds to the stored proposal |
| D8 store | Deployed Firestore failure → refuses memory fallback (test forces the constructor to raise); local/non-deployed → memory with explicit notice |
| D9 audit chain | Firestore transactional append over a chain-head doc; transaction.create() makes a racing writer abort instead of overwrite |
| D10 validation | checks subset in the request is rejected, full domain battery always runs |
| D13 claims lint | .py in scanned extensions; run clean this session over the promoted layer scope |
4. Phase 2 — wiring
src/shared/mizoki_governance/ one-import adoption layer present; google_ads_gaql carries canonical_adapter.py + orchestrator DCP wiring with tests/remediation/test_gaql_governance_wiring.py; Cell 26 DoWhy validator registration per plan §4b; OPS-001 production/service-registry.yaml exists (now v2, deployed-fleet posture).
5. Phase 3 — the canonical data file
src/shared/miz_oki_source_of_truth.py v3.5.4 (LAST_VALIDATED 2026-07-28): shapes mirrored from mizoki_contracts with the package declared authority (CONTRACTS_AUTHORITY), values (MODEL_ROLES, NON_BYPASSABLE, STAGE_ROUTING) kept here. check_conformance() asserts the reconciliation itself: _check_contracts_mirror() (drift = violation when the package is importable), policy.yaml parity including per-domain 90s and advisory_only, and no reachable dev signing-key default (D18-scoped to the dev constant). The prompt's "import rather than restate" mandate was resolved to the mirror-with-parity outcome the prompt itself pre-authorized for the stdlib-only constraint; INTEGRATION_PLAN.md §1.3 records the rationale.
6. Phase 4 — verification gates re-run at HEAD (this session, 2026-07-29)
| Gate | Result (verified result) |
|---|---|
python3 -m unittest tests.test_six_domain_blueprint |
29/29 OK |
python3 -m pytest tests/remediation |
127 passed (includes the 8 e2e, contract/service hardening, core↔contracts parity, token minters, D18 scope, DATA-001/002, TENANT-001, Phase 13, Phase 16 ×2, GAQL wiring) |
python3 -m pytest tests/shared/test_virtuoso_models.py |
34 passed (strict path — jsonschema installed) |
check_conformance() (contracts importable → mirror check live, not skipped) |
0 violations at v3.5.4 |
tools/claims_lint.py over the layer scope + this report |
clean |
diff -rq across the two virtuoso_models homes |
byte-identical |
Environment notes (container-only, not repo defects): fresh cloud runner needed pip install -c ops/remediation/constraints.txt pydantic fastapi httpx pytest jsonschema, pip install -e contracts/, google-auth, google-cloud-firestore, and a fresh cryptography wheel to shadow a broken Debian-packaged one (pyo3 panic on import). With those installed every gate passed unmodified.
7. Prohibitions — held
advisory_only: trueon both finance and CRE inservices/service-policy-engine/policy.yaml; conformance pins it.FORBIDDEN_AUTONOMYintact inmizoki_core/control_plane.py— counsel legal conclusions, estate fiduciary/disposition, risk committee/board, CRE binding commitments.- No Stage-4 promotion: every real actuator remains Stage 3; Stage-4-without-adapter → 501 (also proven live in Phase 6, per
docs/LIVE_VERIFICATION.md). - Claim ceiling unchanged:
status_label: "built, pre-benchmark"in the source of truth; no verified/benchmark/pilot performance language introduced by this report — its "verified result" labels attest gate outcomes, not platform performance.
8. CLAUDE.md session record
Present: the July 27 integration record (v6.45.30 "REMEDIATION LAYER INTEGRATED") and its successors through v6.45.35, matching the tree state verified here.
Verdict
MIZ-REC-2026-002 was properly superseded, and everything it mandated that remained valid was carried forward through docs/INTEGRATION_PLAN.md and landed: promotion to canonical paths, the full defect ledger closed with ID-cited commits, contracts-wins rulings enforced by a live parity check, the source of truth reconciled and self-asserting, and all six gates green when re-run from scratch on 2026-07-29. The two mandates it stated that were not executed literally — producing docs/RECONCILIATION_PLAN.md and rewriting the source of truth to import pydantic shapes — were superseded by its successor directive and by its own recorded fallback, respectively, and both substitutions are documented in the plan of record.