MIZ OKI · Causal Intent Platform · GATE-2

ORACLE Pre-Conversion Intent

Every document, the whitepaper, and the operator machinery for the pre-conversion intent lane — with the honest activation state kept front and center.

GATE-2 DDLDeployed Activation flagsAll OFF Holdout · III.6Pending operator Serving / targetingOut of scope

The lane is built and GATE-2 DDL-deployed, but not activated. Every capture, scoring, and hypothesis flag is OFF — zero person-level activation. Activation stays blocked by the workflow's own constitutional gate until an operator registers the holdout through Cell 36. No LII/intent activation without a holdout registered before first exposure (CONSTITUTION III.6) — non-waivable by any approval token. iROAS, never platform ROAS, governs DECIDE.

Lane documents

05 The written record: what to do, what landed, and what was verified.

Whitepaper

02 The current governing whitepaper. Landed by the Growth Control lane — not this session.

Operator machinery

05 The code and config an operator dispatches — everything defaults OFF and fail-closed.

Shared-memory records

02 Cross-repo lessons — also published to the standalone mizoki-shared-memory repo.